Index
2015 November 1st - Installing the Engine
2015 November 7th - Installing Front hubs
2015 November 22nd - Wheels
2015 November 27th - Brake Switch
November 1st - Installing the Engine
Kattie and Keith helped me bolt the transmission to the engine and mount it in the frame
Transmission dip stick
Master Cyclinder and pedal
November 7th - Installing Front hubs
The Wilwood hub came drilled for both Ford and Chev rims. The whole assembly
is well deigned and built.November 22nd - Wheels
Rockets Wheels for the front tires
Weld Wheels for the rears - Wide 5
Quick Change Bells with new tubes incalled drilled, tapped and bolt installed
November 27th - Brake Switch
Mounted my "Ron Francis Wiring" manual break switch. Nice switch.